Where a garden gym is to have a tap, a washbasin or a shower, the Water Supply (Water Fittings) Regulations 1999 set a notice and consent step for some water work and technical requirements for water fittings. This article sets out what regulation 5 and Schedule 2 of the Regulations say, as read on legislation.gov.uk on 12 November 2026 with no known outstanding changes, and what Northumbrian Water, Essex & Suffolk Water and Wessex Water say about them on their own pages. The Regulations name the Secretary of State and, for water undertakers wholly or mainly in Wales, the National Assembly of Wales as “regulator”. Northumbrian Water’s page refers to Byelaws in Scotland, and this article does not cover Scotland or Northern Ireland.

The rule: notice first, consent before work

Regulation 5 says any person who proposes to install a water fitting in connection with any of the operations in its Table must give notice to the water undertaker that work is about to begin, must not begin without the undertaker’s consent, which shall not be withheld unreasonably, and must comply with any conditions of consent. Northumbrian Water and Essex & Suffolk Water state the same rule in matching wording, and Wessex Water says work cannot start until consent has been given.

Items on the Table that a garden gym can touch

  • the erection of a building or other structure, not being a pond or swimming pool;
  • the extension or alteration of a water system on premises other than a house;
  • a bath of more than 230 litres, measured to the centre line of overflow;
  • a single shower unit connected to a supply pipe of a type specified by the regulator;
  • a pump or booster drawing more than 12 litres per minute;
  • a garden watering system, unless designed to be operated by hand;
  • any water system laid outside a building and either less than 750mm or more than 1350mm below ground level.

On the shower item, the Northumbrian Water and Essex & Suffolk Water pages add that there are none currently specified. The sources do not say whether a garden outbuilding with no water fitting falls within regulation 5, which is framed around installing a water fitting.

What an approved contractor changes

Regulation 5(2) says the regulation does not apply to installation by an approved contractor of a water fitting falling within Table paragraph 2 (the extension or alteration of a water system on premises other than a house), 4(b) (a bidet with an ascending spray or flexible hose) or 4(g) (a reduced pressure zone valve or similar device). An approved contractor is a person approved by the water undertaker for the area or certified by an organisation specified in writing by the regulator. The exemption does not list the erection of a building or the depth of outside pipework. Wessex Water says that using an approved plumber may remove the need to tell it before work starts, depending on the work, and that the plumber then sends a certificate; it adds that legal responsibility for breaches in certified work falls on the approved plumber and not on the customer.

What the notice contains and how long consent takes

The notice must include the name and address of the person giving it, a description of the proposed work, particulars of the location of the premises and their intended use, and, for most items, a plan and a diagram showing the pipework and fittings. The plan and diagram are not required for a bath over 230 litres, a shower unit, a garden watering system or a large pond or pool. The undertaker may withhold consent or grant it with conditions within ten working days. If it gives no notice in that period, consent is deemed granted unconditionally, although the Northumbrian Water and Essex & Suffolk Water pages say this does not remove the duty to meet the Regulations in full. Wessex Water says there is no charge for notification or consent.

Pipes in the ground: frost, joints and concealment

Schedule 2 paragraph 7(4) says any water fitting laid below ground level must have a depth of cover sufficient to prevent water freezing in the fitting. The 750mm and 1350mm figures appear in the notification Table, not in that paragraph. Paragraph 7(1) says no water fitting shall be embedded in any wall or solid floor, and paragraph 7(2) says no fitting designed to be operated or maintained, or which consists of a joint, shall be a concealed water fitting. A concealed fitting includes one installed below ground or passing through or under any wall, footing or foundation, or one in any other inaccessible position.

Before the tap is used

Paragraph 4 requires every water fitting to be watertight and installed so as to inhibit damage by freezing. Paragraph 11 requires a system that can be drained down, with an adequate number of servicing valves and drain taps and enough stopvalves to isolate parts of the pipework. Paragraph 13 requires every water system to be tested, flushed and where necessary disinfected before first use. Paragraph 15 requires adequate devices to prevent backflow, appropriate to the highest applicable fluid category downstream.

What the company pages add

The three company pages are undated, and each publishes its own notification form. Wessex Water also says that failure to comply with the regulations on new installations could mean the water supply is withdrawn, and asks for the name and address of the approved plumber on its notification form where one is doing the work.

The bottom line

Regulation 5 requires notice and consent before installing a water fitting in connection with listed operations that include erecting a building or structure and laying outside pipework shallower than 750mm or deeper than 1350mm, and an approved contractor is exempt only for the items regulation 5(2) lists. Consent is deemed given after ten working days of silence, but the Northumbrian Water and Essex & Suffolk Water pages say the Regulations must still be met in full. The sources do not say whether an outbuilding with no water fitting falls within regulation 5.

Sources

  • The Water Supply (Water Fittings) Regulations 1999, regulation 5, Notification, legislation.gov.uk, latest available (revised) version, read 12 November 2026 (legislation.gov.uk)
  • The Water Supply (Water Fittings) Regulations 1999, regulation 1, Citation, commencement and interpretation, legislation.gov.uk, read 12 November 2026 (legislation.gov.uk)
  • The Water Supply (Water Fittings) Regulations 1999, Schedule 2, Requirements for water fittings, legislation.gov.uk, read 12 November 2026 (legislation.gov.uk)
  • Regulation 5 notification, Northumbrian Water, page undated, read 12 November 2026 (nwl.co.uk)
  • Regulation 5 notification, Essex & Suffolk Water, page undated, read 12 November 2026 (eswater.co.uk)
  • Plumbing notifications, Wessex Water, page undated, read 12 November 2026 (wessexwater.co.uk)